Sorry, there are currently no results available

Projects

News

Recent Publications

Vídeos

Offices

Iron ore – Jindal Group
Complex integrated in the Mutún

Bolivia

IDOM has developed, on behalf of the Jindal group, the Basic Engineering of an Integrated Complex for the iron ore beneficiation plant with a capacity of 25 Mtpa, located in El Mutún (Bolivia), which includes:

  • Pellet Plant – 10 Mtpa.
  • DRI Plant – 6 Mtpa
  • Steelworks – 2 Mtpa
  • Hot-rolling mill- 1.7 Mtpa

Iron & Steel

  • Share on Facebook
  • Share with Linkedin

CLIENT:
JINDAL STEEL & POWER

SCOPE:
Basic Engineering

  • JINDAL_EN_EL_MUTUN_Iron_ore_Idom01
  • JINDAL_EN_EL_MUTUN_Iron_ore_Idom02
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.